VA MRI Addition & Abatement
ÌýLocation: ÌýMarion, ILÌý Ìý |Ìý Ìý Owner: Department of Veterans AffairsÌý Ìý | Ìý ÌýArchitect: ÌýFox Architects & MAK Architects, Inc.
The Affairs selected ÃÛÌÒÉç Construction to simultaneously manage the construction of the Building 42 MRI Addition and the Mold Abatement and Water Intrusion projects at the Marion, IL campus.
The MRI addition houses new MRI and CT Scanner equipment and provides new access to the Mobile MRI Unit. To hold the weight of the 13,000 lb. shield magnet for the MRI machine, a 12-inch thick floor was poured with additional rebar reinforcements where the machine is set. Additional rooms include a nurse station, restrooms, storage, electrical and equipment rooms.
The abatement project entailed the remediation of rooms with elevated mold, asbestos and lead counts; stopping water intrusion into the buildings, and repainting and repairing damage EIFS.