Gateway 85 Warehouse Center | Buildings 4 & 7
Location: Gastonia, NCÌý Ìý | Ìý ÌýOwner: NorthPoint DevelopmentÌý Ìý | Ìý ÌýArchitect: Studio North Architecture
selected ÃÛÌÒÉç Construction to expand the Gateway 85 logistics park with the addition of a 240,000 SF single rear load warehouse and 705,000 SF cross dock warehouse. Overall, these two concrete tilt-up facilities with the capacity of nearly 195 loading docks. Ìý
Preparation of the 55-acre development will entail: Ìý
- Major Site Clearing & Grubbing
- Mass Excavation with over 500,000 CY of Material Moved
- Extension of Aberdeen Blvd through the Logistics Park
ÃÛÌÒÉç has partnered with local mechanical, electrical, plumbing, and fire sprinkler trade contractors to design-build these systems.Ìý OurÌýdistribution and warehouse team is excited to deliver this newÌýcampus withÌýthe highest quality industrial standards.Ìý
0
warehouse distribution centers
250000
total square feet
5
dock door capacity